Utah's extreme-heat projection, November 2026
How much hotter Utah gets by 2050: 9 counties ranked on projected 95°F days, from Cache County to Washington County, with the change from 1991-2020.
From the 1991-2020 baseline to the 2040-2069 window, Utah adds +22 days of 95°F weather a year, from 13 days to 35 days (a sizeable increase). 5 of its 9 larger counties are projected at a month or more of such days; 1 at two months or more. The largest increase belongs to Tooele County (+32 days).
The table
| County | 95°F, 1991-2020 | 95°F, 2040-2069 | Change | 100°F, 2050 | Model range | Population |
|---|---|---|---|---|---|---|
| Washington County | 36 days | 67 days | +31 days | 36 days | 57 to 85 | 189,827 |
| Tooele County | 26 days | 58 days | +32 days | 28 days | 50 to 77 | 76,648 |
| Davis County | 17 days | 48 days | +31 days | 18 days | 36 to 68 | 366,742 |
| Box Elder County | 15 days | 44 days | +29 days | 17 days | 36 to 61 | 59,725 |
| Salt Lake County | 13 days | 36 days | +24 days | 14 days | 27 to 52 | 1,184,689 |
| Weber County | 8.9 days | 29 days | +20 days | 9.8 days | 21 to 42 | 266,183 |
| Iron County | 7.2 days | 29 days | +22 days | 7.5 days | 20 to 44 | 60,201 |
| Utah County | 7.6 days | 26 days | +18 days | 7.8 days | 19 to 39 | 683,622 |
| Cache County | 2.7 days | 15 days | +12 days | 3.7 days | 10 to 23 | 137,031 |
The spread inside the area
Washington County and Cache County bracket the area at 67 days and 15 days; Tooele County adds the most days (+32 days). 5 counties are projected at 30 days or more, 1 at 60 or more.
Mid-century counts in bars:
100°F days and the summer high
Utah's 100°F days: 2.2 days historically, 14 days projected; Washington County has the most at 36 days. For the average summer afternoon the change is 85°F to 90°F; for July, 88°F to 94°F.
Range around the mean
Spread for the hottest county: 57 days to 85 days around a mean of 67 days. For the coolest: 9.5 days to 23 days. The ranges are the reason the table reports means to the day but should be read to the week.
The climate columns are LOCA2 downscaled projections under SSP3-7.0, a scenario in which emissions keep rising through mid-century. By 2050 the scenarios differ less than the models do, which is why the model spread, not the scenario, is the uncertainty reported here.
Zooming in on the top row: Washington County by the numbers: population 189,827; rent $1,841, +0.7% over twelve months; home value $520,504; income $76,411; price-to-income 6.8x; 95°F days 36 days then 67 days; 75.1% of monitored days in the EPA's good band; expected loss $820 per person; commute 19 min.
Related: Utah page, coolest 2050 summers among affordable counties, biggest increase in extreme heat by 2050, model spread, explained, the 2050 heat layer and methodology.
Cache County, the complete card: A quick portrait of Cache County: population 137,031, rent $1,445, typical home $462,759 against an income of $78,292 (price-to-income 5.9x). Heat runs from 2.7 days of 95°F days now to 15 days in the projection. It has clean air at its monitors 66.0% of the time, a FEMA expected loss of $292 per person led by flooding, and workers travel 17 min each way.
Benchmarks: 35 days for the median US county, 0.5 days for the leader among 100k+ counties (San Francisco County, CA) and 168 days for the laggard (Yuma County, AZ).
Limitations. The eight LOCA2 models are a sample of the CMIP6 ensemble, not the whole of it, and the spread shown is the spread of model means, which understates the full range of possible outcomes. Humidity, which decides how a 95°F day feels and how dangerous it is, is not in the count. Counties under 50,000 residents are excluded from the table in larger areas.